Slab foundation building in Hoover AL - a dry, solid base for your new home

Planning a new home or addition in Hoover? We prep the fill, keep out moisture and termites, and pour a slab you can build on.

A broad reddish-brown stamped-concrete patio extends beside a house, with a raised stone planter and garden beds.

What does it take to build a slab foundation in Hoover?

Slab foundation building in Hoover means pouring your house's concrete floor and foundation as one piece on a packed bed of fill, with a moisture barrier and termite treatment underneath, so the home starts out dry and solid.

Most folks who call us about a slab have a lot, a set of plans and a builder waiting on the concrete, or they're adding rooms or a garage onto a house that already sits on one. The price mostly turns on the size of the footprint, how much digging and fill the ground needs to get firm and drain right, the steel, any deeper concrete footings the plans call for, and how easy it is to get trucks to the spot. The schedule turns on the city's permit steps, the weather on pour day and the cure afterward. We're based in Hoover and work in Birmingham and many of the cities around it, and I'll give you your own figure after I've walked the lot, in an estimate that spells out what's in it, since nobody can see what's under the topsoil from a set of drawings.

How do you know it's time to plan a slab foundation?

How we handle slab foundation building, step by step

I start where the water goes, because a slab that sits in a low spot or sheds rain toward the house will fight you as long as it's there. Our crew digs out the soft topsoil and packs the fill in layers to make the subgrade, the firm bed the slab sits on, since dirt that's only raked level settles later and takes the concrete down with it. The termite treatment of the fill and the moisture barrier, a heavy sheet that keeps ground damp out of your floors, are the two steps nobody can get back to once the concrete is down, so I walk you through where they fall and we get them lined up before pour day. Then we set the rebar, steel inside the slab that holds it together, pour early in the day to stay out of the midday heat that leaves a weak, dusty top, and cut control joints, shallow grooves that give the slab a spot we chose to crack before it picks its own. If the budget gets tight, I'd rather trim the finish than the base, because the base is buried on day one and it's the part that decides whether the slab stays put.

Some houses don't sit on a slab at all, and if your plans show a crawl space or walls under the floor, that's our foundation installation work, with the same care about water underneath. The packed base that keeps a house slab steady is the same thing a lot full of cars needs, so we bring it to concrete parking lot building for businesses and other properties too.

  • Slab for a new home

    Best when you're building on a cleared lot and the plans put the first floor right on the ground. We work with your plumber so the lines coming up through the slab are set and checked before the concrete covers them.

  • Slab for an addition or garage

    Fits a room, sunroom or garage going onto a house that already sits on a slab. The new pad has to meet the old floor at the right height and shed water away from both, so we work that out on the first visit.

Get a free estimate for your slab foundation

Send the form and we'll get back to you within one business day to set a time for me to walk your lot. The estimate is free, done at your place, and comes with no obligation.

Email
estimates@concretehoover.com
Based in
Hoover, AL 35216
Hours
Mon–Fri: 7 AM–10 PM, Sat–Sun: 6 AM–11 PM

What happens after you call about a slab in Hoover?

From your first call to the final walk-through, here's who does what on a slab job with us, and where the city's steps fit in.

  1. Call or send the form

    Call (205) 325-9006 or send the form, and we'll set a time for me to come out to your lot. Plans or a rough sketch of the footprint help if you've got them.

  2. Walk the lot with me

    I look at the ground and where the rain runs, and we go over your plans together. Your estimate spells out what's in it, from the dirt work to the barrier and steel, so you can see where the money goes before you decide.

  3. Permit, prep and pour

    Once you're ready, we sort out the permit side with the building office and set the pour around the inspections, since the city inspects and approves construction work along the way. Ask me anytime where each inspection lands on the calendar.

  4. Walk the finished slab together

    Before we pack up, we walk the finished slab with you and look at anything you want to see. I'll also tell you what it can handle in the first days while it cures.

Why Hoover homeowners call A&B Hoover Concrete Construction for slab work

If you've got a lot and a set of plans, send us the details or call (205) 325-9006, and I'll come out and walk it with you.

Slab foundations and home permits in Hoover

In Hoover, nothing gets built until a residential building permit is in hand, and the City of Hoover holds homeowners and contractors to that alike. On a new home, an inspector from the Building Inspections Department first has to approve the erosion control on the lot, things like silt fence that keep dirt from washing off, and putting those in is the only work allowed before the permit. After the foundation goes in, the city wants a certified survey of it for all new construction, including work that changes a building's footprint, and building should stop until the department approves it, with no rough inspections scheduled until then. Before we schedule anything, we check with the building office for your address about what the job needs, and when a permit is called for, we handle the paperwork and leave room in the plan for those stops so the survey wait doesn't catch your framer by surprise.

Termites can be active year-round across most of Alabama, so treating the fill isn't a step to leave for the last minute, because the slab covers it for good. We see plenty of sloped lots that send rain toward the house pad, on slab jobs in Birmingham and Vestavia Hills as much as here, and we grade those before a yard of concrete shows up.

Questions about slab foundations in Hoover

How much does a slab foundation cost in Hoover, AL?

A reinforced concrete slab in the Birmingham area usually costs about $6 to $11 per square foot, and that's the going rate around here, not a quote from us. Your own figure comes from the estimate after I've seen the lot, and the work is backed by our satisfaction guarantee.

Do I need a permit to build a slab foundation in Hoover?

Yes, Hoover requires a residential building permit before any construction starts, whether a contractor or the homeowner is doing the work. On a new home there are city steps before and after the slab, covered in the Hoover section above, and we plan the job around them.

How long does a new concrete slab take to cure?

Concrete takes about a month to fully cure, though a new slab should be walkable within 48 hours. Curing is the stretch where the concrete keeps hardening and gaining strength, so to be safe you may want to wait a week before putting heavier loads on it.

Can I be my own builder on a house slab in Alabama?

You can under the state's homeowner exemption, but you'll still need licensed subcontractors for any part of the job that costs more than $10,000.00. The Alabama Home Builders Licensure Board covers residential work where labor and materials together come to more than $10,000, so a concrete crew on a slab over that line needs that license.

How do I keep moisture from coming up through a slab foundation?

The main defense is a moisture barrier laid under the concrete and installed properly before the pour. One barrier maker says a properly installed one reduces or eliminates damage to floor coverings and mold or mildew indoors, so it's fair to ask any crew how they put it down. We lay ours under the whole slab and check it for tears before the concrete goes on, and good drainage around the house helps too.

Will a new slab foundation crack?

Most slabs get some fine cracks as they dry, but the cracks that cause trouble usually come from a base that settles or water working underneath. That's why we pack the fill, set the steel and cut the control joints described above. The state's geologists list drainage problems and heavy rainfall among the causes of sinkhole collapse in Alabama, so ask any builder how they'll handle drainage on your lot.

Cities we serve for slab foundations

A&B Hoover Concrete Construction is based in Hoover, Alabama, and 12 cities have their own page on this site, including Pelham and Helena. Those aren't the only places we work, so if your lot is nearby, give us a call.

Hoover, AL

Get your slab foundation on the schedule

Have the lot address, the planned home size and where you are with the permit handy, and I can price your slab around real numbers instead of guesses.